A paver calculator works out how many pavers to buy for a patio, path or driveway, plus the gravel base and bedding sand that go underneath. Enter the area and your paver size and it returns the count with a waste allowance, then the base and sand volumes to order.
Pavers are a "both" job: the pavers and base materials ship to the door, and a larger patio or driveway is also a get-quotes job for a paver installer. That makes this one of the better-monetising pages on the site.
Paver count = area ÷ paver area × (1 + waste), rounded up. The base is the area × the base depth (4 inches typical), and bedding sand is the area × 1 inch — both reported as cubic yards or metres so you can order them by volume.
A 12 ft × 10 ft patio is 120 sq ft. With 6 × 9 inch pavers (0.375 sq ft each) and 5% waste, you need about 336 pavers, plus roughly 1.5 cubic yards of gravel base and 0.37 yards of bedding sand.